1977 - adoption of a bylaw to start the construction of the metro system in Yerevan.
1972 - beginning of the design of the first metro line section.
1988 - the end of the design stage.
Based on the bylaw of 1977, Armgiprotrans Institute was set up along with the construction of the Yerevan Metro.
Yerevan Metro in figures: |
|
Number of lines | 2 |
Total length, km | 12,1 |
Number of stations | 10 |
Number of depots | 1 |
Daily ridership, mio pax | 0,041 |
Number of interchange stations | 1 |
Inventory rolling stock, thous | 0,045 |
Fulfillment of train schedule, % | 99,98 |
Minimum headway, sec | 300 |